The Variability Tree

This entry is part 19 of 21 in the series queueing theory

All processes are subject to some variability.  More common explanations of variability describes variability as either Common-Cause or Special-Cause.  The former is easiest explained as expected variation within a process that is produced by the process itself.  The latter, on the hand, is variation that is produced by the process by is assignable to some outside force.   From a Queueing Theory perspective, another way to think of variation is by stratifying variation based on predictable and unpredictable.  But, before we go there, let’s revisit what Queueing is all about.

All processes involve inputs, a server, and outputs. This flow of events can be approximated with the picture below:


The picture above is simplified, but several points of variability can enter this simple system.  For example, we take our kids to Picture People, a place we you can have your pictures takes (highly recommended for high quality pictures).  We enter their system, wait, pictures are taken, then we leave.  All business have either documented “busy times” and it’s by hunch — and the hunch is actually correct.  This point is important.

Below is a Variability Tree, showing Predictable and Unpredictable Variability. This distinction is important because managing either type of variability will be different:


Most systems will show evidence of variability, as explained in the picture above; some will show both types, but typically one type will dominate.

For processes where arrivals are “bursty” or unpredictable, then the tools of Queueing Theory makes sense to apply; but for processes where the arrivals are predictable or seasonal, then it might make sense to apply the tools of Build-Up Diagrams.

How To Manage Variability

When reducing or eliminating variation is not the answer, then managing it is the next best thing to do.  Below is a simple table that shows the impact of variability on a system.  I built this diagram quickly, but you can modify this table for your particular process; I’ve made it general enough so that you can apply it to your particular situation:

I’m using the term “Inventory” in a generic way here — it can mean people (patients) or actual things.  For example, when the Waiting Room Size is bigger, then output can increase but there’s also an increase in the amount of patients in the room (patients = inventory).  Use this trade-off table as it applies to your process.

It’s About the Customer

It’s important to always remember that it is Variation that people feel, not the average.  Managing the variability in your process takes work and some knowledge of tools that are pragmatic and helpful.  The “average” is an inadequate measure and is not descriptive of what the customer is feeling.  If the customer is to benefit, we must take action against variation through reducing it or eliminating it and then managing it.

+++++

Articles on Queueing Theory

+++++

For articles on Operations, lean and six sigma, please visit the links below:

Series Navigation«On Queueing and Elevator MirrorsAttitude and the Pyschology of Queueing»

Short URL: http://bit.ly/Ho24

Share This Post:



  • Digg
  • Facebook
  • del.icio.us
  • Suggest to Techmeme via Twitter
  • StumbleUpon
  • LinkedIn
  • email

2-pizza teams (10)
3 C's (3)
5S (38)
A3 Report (9)
adoption (7)
agile/software (59)
ajax (4)
amazon (53)
apple (3)
apple iphone (7)
axiom (3)
Aza Raskin (9)
backcountry.com (2)
berlin (1)
bill gates (1)
bill marriott (1)
blog tag (1)
book reviews (4)
bullwhip effect (5)
business (394)
business plans (3)
busm361 (13)
BzzAgent (12)
call center and queueing (11)
car buying (2)
Carbonite (1)
change management (5)
chicago (1)
click fraud (1)
click-to-ship (21)
clocky (2)
colin powell (2)
community (2)
company interviews (18)
company interviews (6)
complexity (32)
costs (8)
culture (7)
customer experience (10)
customer obsession (52)
customer recovery function (1)
customer segmentation (8)
customer service (17)
design thinking (14)
digg (4)
drum-buffer-rope (38)
dublin (1)
dynamic systems (24)
eBay (6)
economics (3)
efficiency (4)
ethnography (29)
family (18)
featuritis (15)
flexibility (1)
forecasting (2)
four performance dimensions (2)
Fun With The 2×2 Matrix (1)
game theory (7)
Gemba (67)
genchi genbutsu (68)
general (135)
germany (1)
google (15)
heijunka (65)
holidays (1)
hoshin kanri (1)
how to be a human (1)
IDEO (2)
image uploading (1)
iphone (5)
ishikawa (69)
IT at Toyota (67)
just-in-time (4)
kaizen (4)
kanban (46)
law of instinct (1)
Leadership (43)
lean (165)
Lean Consumption Maps (98)
learning curve (1)
licketyship (1)
mark cuban (1)
martin luther king (1)
mary poppendieck (1)
metrics (73)
microsoft (6)
milton friedman (1)
moving average (1)
muda (68)
nba fines (1)
net promoter score (nps) (1)
obeya (39)
Off-Topic (1)
onstar (1)
operations (108)
pageviews (3)
pareto principle (39)
patent (1)
peanut butter manifesto (2)
philosophy (3)
Poka-Yoke (6)
poppendieck (3)
powerpoint sucks (2)
private equity (4)
process measures (6)
product development (20)
productivity (4)
quality (41)
quasimodal design (1)
queueing theory (41)
Raffle (1)
rational choice (2)
regression analysis (18)
respect for people (6)
root cause analysis (60)
sarah+palin (2)
seth godin (1)
simplicity principle (10)
six sigma (128)
snowboarding (2)
social media (3)
spam (1)
statistical process control (46)
strategy (46)
suburban (1)
supply chain (24)
takt time (8)
teaching (2)
team size (9)
technology (104)
the beer distribution game (1)
the profit tree (7)
The Visual Factory (11)
theory of constraints (41)
time (2)
timeline (3)
tony+hsieh (11)
toyota (75)
travel (1)
trump bankruptcy (1)
turnaround (5)
twitter (8)
uspto (1)
utah deal flow (2)
variation (69)
venture capital (1)
Visual Management (11)
waste (59)
website traffic (2)
Wing Chun (2)
wisdom of crowds (1)
wisdom teeth (1)
word-of-mouth marketing (18)
yahoo (2)
zappos.com (12)
zero defects (3)

WP Cumulus Flash tag cloud by Roy Tanck and Luke Morton requires Flash Player 9 or better.


If you enjoyed this post, please consider to leave a comment or subscribe to the feed and get future articles delivered to your feed reader.

Comments

No comments yet.

Leave a comment

(required)

(required)


Additional comments powered by BackType