All processes are subject to some variability. More common explanations of variability describes variability as either Common-Cause or Special-Cause. The former is easiest explained as expected variation within a process that is produced by the process itself. The latter, on the hand, is variation that is produced by the process by is assignable to some outside force. From a Queueing Theory perspective, another way to think of variation is by stratifying variation based on predictable and unpredictable. But, before we go there, let’s revisit what Queueing is all about.
All processes involve inputs, a server, and outputs. This flow of events can be approximated with the picture below:
The picture above is simplified, but several points of variability can enter this simple system. For example, we take our kids to Picture People, a place we you can have your pictures takes (highly recommended for high quality pictures). We enter their system, wait, pictures are taken, then we leave. All business have either documented “busy times” and it’s by hunch — and the hunch is actually correct. This point is important.
Below is a Variability Tree, showing Predictable and Unpredictable Variability. This distinction is important because managing either type of variability will be different:
Most systems will show evidence of variability, as explained in the picture above; some will show both types, but typically one type will dominate.
For processes where arrivals are “bursty” or unpredictable, then the tools of Queueing Theory makes sense to apply; but for processes where the arrivals are predictable or seasonal, then it might make sense to apply the tools of Build-Up Diagrams.
How To Manage Variability
When reducing or eliminating variation is not the answer, then managing it is the next best thing to do. Below is a simple table that shows the impact of variability on a system. I built this diagram quickly, but you can modify this table for your particular process; I’ve made it general enough so that you can apply it to your particular situation:
I’m using the term “Inventory” in a generic way here — it can mean people (patients) or actual things. For example, when the Waiting Room Size is bigger, then output can increase but there’s also an increase in the amount of patients in the room (patients = inventory). Use this trade-off table as it applies to your process.
It’s About the Customer
It’s important to always remember that it is Variation that people feel, not the average. Managing the variability in your process takes work and some knowledge of tools that are pragmatic and helpful. The “average” is an inadequate measure and is not descriptive of what the customer is feeling. If the customer is to benefit, we must take action against variation through reducing it or eliminating it and then managing it.
search terms for this article:
variability tree, inventory system diagram, process flow variability, queuing theory diagram, queuing theory and variation, queuing model images, queuing theory graph, queuing theory illustration, queuing theory Images, amazon chart diagram jeff bezos, queuing theory in production, queuing theory trade off, sample illustration of queuing theory, the use of inventory Models Queuing Theory, variability queueing theory, what are queuing theory with diagram, what is flow variability, what is flow variability?, what is flow variabilityinprocessflow, queuing flow variability, queueing variability, business operations process variability queuing theory, checking variability in trees, diagram explanation of queuing theory, flow diagram queuing theory, Four types of Waiting Line Theory illustration, illustration on the use of queuing theory, illustration queuing theory, images of queueing theory, imges for queing theory, in queueing theory tere is any diagram explanation, inventory system table, pedictable and unpredictable variability, photos of queuing theory, queue and variability, queueing theory diagram, queueing theory flow, what is queuing theory diagramRelated Articles:
![]() |
![]() |
![]() |
||
This post was written by Pete Abilla | ||||













The Apple iPhone Supply Chain
Jeff Bezos and Root Cause Analysis
The Toyota A3 Report
Queueing, Disneyland, and FastPass
Zipcar Customer Experience: Variability, Utilization, and Queueing
Process Control and Luck
Poka Yoke Example: Prevent Error Through Embarrassment and Humiliation
Queueing Theory: Part 3
Emergency Room (ER) Wait Times
Quality and Continuous Improvement;